PCI DSS (Payment Card Industry Data Security Standard) mentions significant change in several of its requirements. Often, organisations can fall foul of this requirement because they simply don’t understand what is meant by a ‘Significant Change’. This article will hopefully help organisations to understand this terminology, identify what this means to them and help to ensure PCI DSS requirements which rely on significant changes can be fulfilled.
What is a Significant Change?
A significant change can vary from environment to environment, what a significant change to Company X may be different to what a significant change is to Company Y. My recommendation to all my clients is to document what a significant change means to them and their environments, listing out changes that would meet this requirement. PCI SSC (PCI Security Standards Council) released FAQ 1317 in 2015 which included a couple of sentences to help understand what is meant by a significant change as follows;
“Generally, changes affecting access to cardholder data or the security of the cardholder data environment could be considered significant. Examples of a significant change may include network upgrades, additions or updates to firewalls or routing devices, upgrades to servers, etc.”
For me, this is summed up in the following extract “changes affecting access to the cardholder data or the security of the cardholder data environment”, where changes to critical devices and/or security impacting devices could introduce a security weakness to either the cardholder data environment or access to cardholder data should be considered a significant change. This is still open to interpretation; therefore, to ensure assessments run smoothly, this is why I advise my clients to document what types of changes should be treated as a significant change for their specific environment. For example, an organisation may choose to include the commission of a new public facing website as a significant change; whereas, an organisation using Serverless architecture where the number of public facing web services can increase on demand may not deem this as affecting the security of the environment since the new servers are based on the existing webserver which runs a hardened images, meeting PCI DSS requirements. Another example of a significant change may be replacing a firewall for a new vendor’s firewall. This would require significant reconfiguration and the risk of introducing misconfigurations that could compromise the security of the environment would be quite high.
Key PCI DSS Requirements
The following key requirements of PCI DSS Version 3.2.1 are applicable when an organisation is undergoing a significant change. Each of these will be discussed as follows;
- 6.4.6 Upon completion of a significant change, all relevant PCI DSS requirements must be implemented on all new or changed systems and networks, and documentation updated as applicable
All sub requirements of Requirement 6.4 relate to change control requirements. This specific requirement is designed to ensure that all significant changes are carried out in a PCI DSS compliant manner, ensuring all the necessary PCI DSS controls are applied and that any relevant documentation is updated to reflect the changed environment. This can be updates to the asset registry (Critical Devices/Software), updates to build standards (for example, a replacement of a firewall to a new vendor), updates to network diagrams, etc… Suitable checks and balances should be in place to validate that significant changes have been applied as per the requirements of PCI DSS. This should be documented within the change control records to provide an audit trail and to ensure the processed are properly followed.
- 11.2 Run internal and external network vulnerability scans at least quarterly and after any significant change in the network (such as new system component installations, changes in network topology, firewall rule modifications, product upgrades).
This should be self-explanatory. The intention here is to identify any misconfiguration or low hanging fruit vulnerabilities that vulnerability scanners would pick up. This should include both internal and external vulnerability scans.
The change should be adequately planned so these scans run as soon as possible after the change. This will limit the vulnerability window (i.e. the point in time the vulnerability appears, to when the vulnerability was fixed) thus reducing the risk from the vulnerability introduced during the significant change.
The scope doesn’t necessarily have to include the entire environment; however, organisations need to ensure that system components and security impacting systems that can be directly, or indirectly effected by the change are inadvertently missed from the scope. If you are a Level 1 or a Level 2 Merchant that requires a QSA Led Assessment or you are a Level 1 Service Provider, the QSA (Qualified Security Assessor) should pick up on whether the scope is adequate to cover the significant change. If in doubt, discuss this with your QSA.
- 11.2.3 Perform internal and external scans, and rescans as needed, after any significant change. Scans must be performed by qualified personnel.
This requirement supports 11.2 above, requiring rescans should any internal or external scans pick up vulnerabilities that requires rescans under PCI DSS (i.e. CVSS Score 4 or above for external ASV Scans or Internal Scans that have any “high risk” vulnerabilities as defined by the organisation within PCI DSS Requirement 6.1.
- 11.3.1 Perform external penetration testing at least annually and after any significant infrastructure or application upgrade or modification (such as an operating system upgrade, a sub-network added to the environment, or a web server added to the environment).
- 11.3.2 Perform internal penetration testing at least annually and after any significant infrastructure or application upgrade or modification (such as an operating system upgrade, a sub-network added to the environment, or a web server added to the environment).
Requirement 11.3.1 and 11.3.2 are the same; one is for external and one is for internal penetration testing. The response to Requirement 11.2 is very valid here also. Significant changes within PCI DSS environments can inadvertently introduce vulnerabilities which would go undetected until the annual penetration testing activities, massively increasing the vulnerability window, thereby increasing the risk of a compromise to the environment. It is important that penetration testing is planned for in advance, with the penetration test ideally being included within the project deliverables, and the penetration testing company engaged as early into the project as possible. It is worth noting that often penetration testing companies can have 6+ week lead times for delivering penetration tests, therefore this needs to be factored into the project.
- 12.2 Implement a risk-assessment process that:
- Is performed at least annually and upon significant changes to the environment (for example, acquisition, merger, relocation, etc.),
- Identifies critical assets, threats, and vulnerabilities, and
- Results in a formal, documented analysis of risk.
This is often overlooked because the examples do not include technical changes to the cardholder data environment. For me, I would highly recommend organisations to undertake a full risk assessment process for any potentially significant changes that are to be undertaken. This will help the organisation identify and document any new risks to the cardholder data environment that will exist after the change but can also be used to identify where potential risks can be introduced by not implementing the proposed change correctly. This work will not only help the organisation account for any perceived issues from the change but also help identify the correct scope for vulnerability scanning and penetration testing activities.
NIST SP 800-37 (Updated Section to Blog)
Thank you to Jim Seaman for pointing out NIST SP 800-37 Risk Management Framework for Information Systems and Organizations: A systems Life Cycle Approach for Security and Privacy which includes reference to ‘Significant Change’ and highlights examples of what types of significant changes could impact an organisations risk posture. Within Appendix F, there is a section called “Event-Driven Triggers and Significant Changes”, which discusses a significant change as being an indicator or prompt that causes an organisational predefined reaction (defined as an event-driven trigger). An organisations reaction would be to re-evaluate the organisations risk posture based upon the trigger.
NIST SP 800-37 defines a significant change as “A significant change is defined as a change that is likely to substantively affect the security or privacy posture of a system.” Significant changes to systems that may trigger an event-driven review to include, but not limited to:
- Modifications to how information, including PII, is processed;
- Installation of a new or upgraded operating system, middleware component, or application;
- Modifications to system ports, protocols, or services;
- Installation of a new or upgraded hardware platform;
- Modifications to cryptographic modules or services;
- Changes in information types processed, stored, or transmitted by the system; or
- Modifications to security and privacy controls.
Environmental significant changes that may trigger an event-driven review to include, but not limited to:
- Moving to a new facility;
- Adding new core missions or business functions;
- Acquiring specific and credible threat information that the organization is being targeted by a threat source; or • Establishing new/modified laws, directives, policies, or regulations.
My Ramblings
Although this seems to be quite a simple requirement to meet, if organisations are not careful and don’t plan this element of PCI DSS correctly, they can fall foul of it which can jeopardise their PCI DSS Certification.
Hopefully this article will help organisations be better prepared for the implementation of significant changes within their PCI DSS environments.
On a final note, Appendix A3 Designated Entities Supplemental Validation (DESV) also includes provisions for significant change. Not many organisations are asked to complete this supplemental validation by their Acquirers; however, the following related requirements should be considered as an additional validation step after a significant change is carried out (although, unless you have to complete DESV, organisations have no obligation to carry this out);
- A3.2.1 Document and confirm the accuracy
of PCI DSS scope at least quarterly and upon significant changes to the
in-scope environment. At a minimum, the quarterly scoping validation should
include:
- Identifying all in-scope networks and system components
- Identifying all out-of-scope networks and justification for networks being out of scope, including descriptions of all segmentation controls implemented
- Identifying all connected entities—e.g., third-party entities with access to the cardholder data environment (CDE)
PCI DSS Reference: Scope of PCI DSS Requirements
- A3.2.5 Implement a data-discovery methodology to confirm PCI DSS scope and to locate all sources and locations of clear-text PAN at least quarterly and upon significant changes to the cardholder environment or processes.
Data-discovery methodology must take into consideration the potential for clear-text PAN to reside on systems and networks outside of the currently defined CDE.
PCI DSS Reference: Scope of PCI DSS Requirements
As most of you have already probably noticed, Requirement A3.2.1/A3.2.5 activities are designed to validate the scope of the PCI DSS environment. After a significant change, it is most definitely worthwhile validating that changes made haven’t inadvertently brought additional systems and/or networks into scope for assessment activities. A3.2.5 is designed to identify if a by-product of the change has introduced any clear-text PANs (Primary Account Numbers) into the environment.
Ultimately, the expectation is that the organisation will have a defined policy for what it classes as a ‘significant change’ (review the examples within NIST SP 800-37 and reference this within the policy), will perform a risk assessment against any proposed significant changes, will perform actions to mitigate any risks identified, and will have a defined process for what activities are to be conducted (such as pen test etc) when that criteria for a significant change is met.
